ID · Interiors and fit-out

Interior Design and Fit-Out Design in Doha, Qatar

Interior design and fit-out design turn an empty or outdated unit into a working office, restaurant, shop or clinic. Tenants, business owners and landlords in Qatar need it before a fit-out contractor can start. We plan the space, produce the detailed drawings, coordinate the building services and prepare the approvals that let the business open.

Who needs this

  • Companies fitting out an office in Doha
  • Restaurant and cafe owners taking a shell unit
  • Retailers, clinics and salons opening or refurbishing a branch
  • Landlords upgrading lobbies and common areas

What we deliver

  • Space planning layouts with furniture, seat counts and circulation
  • Concept design: material palette, colours and 3D views
  • Detailed drawings: partitions, wall elevations, joinery, flooring and doors
  • Material, finishes and furniture schedules
  • Reflected ceiling plans and lighting plans
  • MEP (mechanical, electrical and plumbing) coordination drawings
  • Landlord or mall design submission package
  • Fit-out approval drawings for the authorities
Authorities

Who reviews the drawings

We prepare each submission, answer the comments and follow up until it is cleared.

  • Qatar Civil Defence (QCDD)

    Reviews the fit-out drawings for fire safety: escape routes, partitions, fire alarm and sprinkler changes.

  • Ministry of Municipality

    Reviews alteration and fit-out works that need a municipal permit.

  • Kahramaa

    Qatar's electricity and water corporation reviews changes that raise the unit's electrical load or water demand.

Process

How it works

The steps below are the usual sequence. We confirm the exact route for your plot and building type at the start.

  1. 01

    Free consultation and survey

    We take the brief and measure the unit. We record existing air conditioning, power, drainage and fire systems.

  2. 02

    Space planning and concept

    We draw layout options with desk or seat counts. We then present materials, lighting ideas and 3D views.

  3. 03

    Detailed design

    We produce the full drawing set and schedules. Our MEP engineers adapt the building services to the layout.

  4. 04

    Approvals

    We submit to the landlord and to the authorities that apply to the unit, and answer their comments.

  5. 05

    Tender and site support

    We issue drawings for contractor pricing and answer technical questions during the works.

What we need from you

  • Tenancy contract or landlord's letter for the unit
  • Commercial registration, or the planned business activity
  • Landlord or mall fit-out guidelines
  • Existing drawings of the unit, if available
  • Brief: headcount or seat count, departments, menu or equipment list

Common causes of delay, and how we avoid them

  • Partitions that block sprinklers or exits

    New rooms change sprinkler coverage, detector positions and the distance to exits. Our MEP engineers review every layout before it is final.

  • Kitchen planned after the dining room

    Restaurant kitchens need an extract duct route, fresh air, power, floor drains and grease interception. We check these at the site survey.

  • Load higher than the unit's supply

    Kitchen equipment and server rooms can exceed the power given to the unit. We add up the electrical load during space planning.

  • Landlord guidelines ignored

    Malls and towers set rules for shopfronts, ceilings, signage and building systems. We read their fit-out guidelines first and design to them.

Office interior design in Doha

Office interior design starts with headcount and departments. We plan desks, meeting rooms, reception, prayer room, pantry and server room against the area you lease. Towers in West Bay and Lusail usually hand over a shell with base air conditioning, sprinklers and fire alarm. Every partition changes those systems. A reflected ceiling plan is a drawing of the ceiling showing lights, grilles, sprinklers and detectors. We draw it together with the MEP drawings.

Restaurant fit-out design

Restaurant fit-out design is led by the kitchen, not the dining room. The menu sets the equipment, and the equipment sets the extract, fresh air, power, gas, water and drainage needs. We plan the flow from delivery to storage, cooking, service and washing, so clean and dirty routes stay apart. Food premises in Qatar must also meet food safety requirements set by the Ministry of Public Health.

The approvals that let a business open

A finished interior is not enough to open. The commercial licence for a premises depends on safety approval from Qatar Civil Defence, which reviews plans and inspects the premises. Alteration works can also need a municipal permit, and the landlord approves the design before work starts. We prepare the drawings for each review and handle the fit-out permit as a linked service. We cannot guarantee an approval or an opening date.

Questions

Interior Design and Fit-Out: common questions

Do you build the fit-out or only design it?

We design, coordinate and obtain approvals. A fit-out contractor carries out the works. We can also manage the project under our project management service.

Do I need approval to change the interior of a rented unit?

In most cases, yes. The landlord will ask for drawings, and changes to partitions, electrical systems or fire systems normally need Civil Defence review. We confirm the exact route for your unit at the start.

Should I involve you before or after signing the lease?

Before, if you can. A short survey shows whether the unit has the power, drainage, extract route and exits your activity needs.

How long does fit-out design and approval take?

It depends on the size of the unit, the landlord's review and the authority comments. We agree a programme with you, but we do not promise authority review times.

Enquire

Tell us about your project.

An engineer will get back to you. The first consultation is free.

What do you need?

We reply during office hours, Sunday to Thursday. Your details are used only to reply to this enquiry.

WhatsApp